View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Fault Tree Analysis | ![]() Operations Failure Mode and Effects Analysis | ![]() Facilitation Dot Estimation |
|---|---|---|---|
Purposedifferent | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | High | High | Low |
Timedifferent | 2-6 h | 2-6 h | 5-20 min |
Participantsdifferent | 3-8 | 3-10 | 3-20 |
Formatdifferent | Workshop + async | Workshop | Workshop |
Outputdifferent | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | FMEA Table, Risk Priority, Mitigation Actions | Effort Heatmap, Risk Signals, Discussion Targets |
Tags1 shared | RiskRoot causeSafety | RiskQualityOperationsRoot cause | EstimationEffortRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.






