methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
MediumLowLowMedium
Timedifferent
30-180 min60–90 min30-60 min1-2 h
Participantsdifferent
1-62-82-84-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaStakeholder Map, Engagement Plan, Risk NotesPower Interest Grid, Strategy per StakeholderAlignment Map, Open Issues, Decision Questions
Tagsno overlap
TroubleshootingDiagnosisEngineering
StakeholdersAlignmentFacilitationChange
StakeholdersFacilitationAlignmentPlanning
AlignmentStakeholdersStrategyFacilitation
Add more methods