View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Agile ROAM Board | ![]() Facilitation Expectation Mapping | ![]() Delivery RAID Log |
|---|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List. | When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 30-180 min | 20-40 min initial, dann laufend | 45-90 min | 30 min Setup, dann laufend |
Participantsdifferent | 1-6 | 3-15 | 3-12 | 1-3 maintaining, briefing for everyone |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Async |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | ROAM Board, Owner List | Expectation Map, Alignment Notes, Agreements | RAID Log, Status Report Source |
Tagsno overlap | TroubleshootingDiagnosisEngineering | RiskAgileTrackingAlignment | AlignmentStakeholdersTeam | RiskTrackingStakeholdersGovernance |



