View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Decision Making Risk Matrix | ![]() Decision Making Assumption Surfacing | ![]() Business Strategy Business Model Stress Test |
|---|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | A Business Model Stress Test checks how well a business model holds up under pressure and headwinds. It compares strengths, risks, market logic, and courses of action. The result is captured as a stress-test report and action plan per scenario. |
Complexitydifferent | Medium | Low | Low | High |
Timedifferent | 30-180 min | 30-60 min | 45-90 min | Half day |
Participantsdifferent | 1-6 | 3-10 | 2-8 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Risk Matrix, Top Risk List | Assumption List, Critical Assumptions, Learning Plan | Stress Test Report, Action Plan per Scenario |
Tagsno overlap | TroubleshootingDiagnosisEngineering | RiskDecisionPrioritizationAssessment | AssumptionsRiskDecisionDiscovery | StrategyBusiness modelRiskDiagnosis |



