View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Product Discovery Pretotyping | ![]() Product Discovery MVP Test Matrix | ![]() Product Discovery Fake Door Test |
|---|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | Pretotyping clarifies whether a customer problem and solution idea create enough real demand. It separates problem, assumption, solution, and evidence, and captures the result as a pretotyping sketch, test setup, and conversion data. | When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. |
Complexitydifferent | Medium | Low | Medium | Medium |
Timedifferent | 30-180 min | Stunden bis wenige Tage | 45-75 min | 1-5 Tage |
Participantsdifferent | 1-6 | 1-4 | 2-8 | Nutzertraffic |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Async |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Pretotyping sketch, Test setup, Conversion data, Go or no-go decision | Test Matrix, Test Plan | Click Data, Interest Signal, Learning Decision |
Tagsno overlap | TroubleshootingDiagnosisEngineering | ValidationDemandMVP | ExperimentsValidationDiscoveryOptions | ValidationExperimentsDemandDiscovery |



