View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
MediumLowLowMedium
Timedifferent
30-180 min30-60 min20-40 min initial, dann laufend1-2 h
Participantsdifferent
1-62-83-154-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaPower Interest Grid, Strategy per StakeholderROAM Board, Owner ListAlignment Map, Open Issues, Decision Questions
Tagsno overlap
TroubleshootingDiagnosisEngineering
StakeholdersFacilitationAlignmentPlanning
RiskAgileTrackingAlignment
AlignmentStakeholdersStrategyFacilitation