View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Operations Gemba Walk | ![]() Operations ABC Analysis | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Medium | Low | Low | Medium |
Timedifferent | 30-180 min | 30-120 min | 30-60 min | 0.5-5 Tage |
Participantsdifferent | 1-6 | 2-6 | 1-5 | 4-10 |
Formatdifferent | Workshop + async | Workshop | Async | Workshop |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Observation Notes, Improvement Ideas | ABC Classification, Focus Rules, Control List | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | TroubleshootingDiagnosisEngineering | LeanObservationProcessOperations | PrioritizationOperationsPortfolio | LeanContinuous improvementOperations |



