methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration for Communication Plan
Delivery
Communication Plan
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
MediumLowLowMedium
Timedifferent
30-180 min45-90 min1-2 Tage2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
1-62-61-4Designers, developers as users, and facilitation
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaCommunication Plan, Channel Matrix, Message CadenceArchitecture Document, Context View, Runtime View, Deployment ViewPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
TroubleshootingDiagnosisEngineering
CommunicationStakeholdersDeliveryPlanning
ArchitectureDocumentationCommunication
ArchitectureEngineeringFeedbackValidationTasks
Add more methods