methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumLowHighLow
Timedifferent
30-180 min10-20 min daily2-8 h15-30 min
Participantsdifferent
1-612-82-6
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaDaily Plan, Time Estimates, Review NotesProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures
Tagsno overlap
TroubleshootingDiagnosisEngineering
PlanningTime managementProductivityOperations
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
Add more methods