methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Expectation Mapping.
Facilitation
Expectation Mapping
Paper illustration for Team Charter.
Facilitation
Team Charter
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of Team Topologies Interaction Modes with its method-specific working model.
Team Design
Team Topologies Interaction Modes
Purposedifferent
When roles, interfaces, or projects fail because of differing expectations, Expectation Mapping surfaces these differences. It shows what each side takes for granted and where the pictures diverge.When a team is starting fresh or working past each other, Team Charter clarifies the shared working basis. It visibly sets out how collaboration, decision paths, and mutual conduct should work day to day.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When several teams collaborate repeatedly, it describes the right interaction mode for each interface between them. It clarifies responsibility, interaction, and load between teams. The result is captured as an interaction heat map and pairwise agreements.
Complexitydifferent
LowMediumLowMedium
Timedifferent
45-90 min2-4 h30-60 minHalf day
Participantsdifferent
3-123-122-8Team-Leads plus Architecture
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Expectation Map, Alignment Notes, AgreementsTeam Charter, Working Norms, Role NotesPower Interest Grid, Strategy per StakeholderInteraction Heat Map, Agreements per Pair
Tags1 shared
AlignmentStakeholdersTeam
TeamAlignmentCollaboration
StakeholdersFacilitationAlignmentPlanning
TeamAlignmentCollaborationOrganization
Add more methods