methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
60-120 min10-30 min je ItemHalf day2-4 h
Participantsdifferent
2-81-83-123-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Conflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsThree-Point Estimate, Risk Range, Assumption NotesLeverage Map, Action StrategyFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
Theory of ConstraintsAssumptionsSystems thinking
EstimationUncertaintyForecasting
Systems thinkingChangeStrategy
Theory of ConstraintsSystems thinkingChange
Add more methods