View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Evaporating Cloud | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | Medium | Medium | High | High |
Timedifferent | 60-120 min | 10-30 min je Item | 2-4 h | 1-5 Tage |
Participantsdifferent | 2-8 | 1-8 | 3-8 | 4-12 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop + async |
Outputdifferent | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Three-Point Estimate, Risk Range, Assumption Notes | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | Theory of ConstraintsAssumptionsSystems thinking | EstimationUncertaintyForecasting | Theory of ConstraintsSystems thinkingChange | ChangeSystems thinkingCapability |



