methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
MediumLowMediumMedium
Timedifferent
60-120 min60-90 min1-3 h45-60 min
Participantsdifferent
2-84-125-302-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Conflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsAnnotated Diagram, Prioritized Risk List, Action BacklogConsensus Clusters, Theme Titles, Priority AreasAssumption map, Test backlog, Risk ranking
Tagsno overlap
Theory of ConstraintsAssumptionsSystems thinking
RiskArchitectureWorkshopValidation
FacilitationConsensusWorkshopAlignment
AssumptionsRiskExperimentsValidation
Add more methods