methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumLowMediumHigh
Timedifferent
60-120 min30-60 min2-4 h2-4 h
Participantsdifferent
2-82-83-123-8
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Conflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsPower Interest Grid, Strategy per Stakeholder7S Assessment, Alignment Gaps, Change ActionsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
Theory of ConstraintsAssumptionsSystems thinking
StakeholdersFacilitationAlignmentPlanning
OrganizationStrategyAlignmentChange
Theory of ConstraintsSystems thinkingChange
Add more methods