View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Evaporating Cloud | ![]() Operations A3 Problem Solving | ![]() Systems Thinking Future Reality Tree | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Medium | Medium | High | Medium |
Timedifferent | 60-120 min | 45-90 min | 2-4 h | 0.5-5 Tage |
Participantsdifferent | 2-8 | 2-5 | 3-8 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | A3 Report, Action Plan, Root Cause Analysis | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | Theory of ConstraintsAssumptionsSystems thinking | LeanProblem solvingCoachingOperations | Theory of ConstraintsSystems thinkingChange | LeanContinuous improvementOperations |



