methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-quadrant grid with tasks sorted by importance and urgency and translated into actions.
Decision Making
Eisenhower Matrix
Paper illustration for Risk Storming.
Architecture
Risk Storming
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
It separates true priorities from noise so it becomes clear what should be done now, scheduled, delegated, or dropped.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
LowLowLowMedium
Timedifferent
15-30 min60-90 min1-2 Tage45-60 min
Participantsdifferent
1-64-121-42-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Eisenhower Matrix, Action List, Delegation NotesAnnotated Diagram, Prioritized Risk List, Action BacklogArchitecture Document, Context View, Runtime View, Deployment ViewAssumption map, Test backlog, Risk ranking
Tagsno overlap
PrioritizationFocusTasks
RiskArchitectureWorkshopValidation
ArchitectureDocumentationCommunication
AssumptionsRiskExperimentsValidation
Add more methods