methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Double Diamond with its method-specific working model.
Innovation
Double Diamond
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
For complex problems with a fuzzy situation, the method cleanly separates search space and decision. It first creates breadth in understanding and then focus in elaboration. This brings open questions, problem definition, and solution path into a traceable movement.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
MediumLowLowHigh
Timedifferent
Wochen bis Monate30 min Setup, dann laufend45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
3-121-3 maintaining, briefing for everyone2-8Evaluation team, architects, and relevant stakeholders
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Problem Statement, Solution Options, Prototypes, Deliverables per PhaseRAID Log, Status Report SourceAssumption List, Critical Assumptions, Learning PlanPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
ProcessDivergenceInnovation
RiskTrackingStakeholdersGovernance
AssumptionsRiskDecisionDiscovery
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods