View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Operations Waste Analysis | ![]() Operations Gemba Walk | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | When there is uncertainty about the real course of a process, the method brings observation to the place where work happens. It combines perception, follow-up questions, and process knowledge so decisions rest on actual workflows instead of assumptions. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | High | Low | Low | High |
Timedifferent | 2-12 Wochen | 45-120 min | 30-120 min | 2-6 h |
Participantsdifferent | 3-10 | 2-8 | 2-6 | 3-10 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Waste Map, Prioritized Waste, Improvement Backlog | Observation Notes, Improvement Ideas | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | Continuous improvementQualityProcess improvement | WasteLeanProcess improvement | LeanObservationProcessOperations | RiskQualityOperationsRoot cause |



