methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for DMAIC.
Operations
DMAIC
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
HighMediumLowMedium
Timedifferent
2-12 Wochen1-3 h1 h bis mehrere WochenOngoing
Participantsdifferent
3-104-101-82-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Project Charter, Measurement Plan, Cause Analysis, Control PlanCurrent-state map, Future-state map, Bottleneck listPDCA Log, Experiment Plan, Learning Outcome, Standard ChangeKanban board, WIP policies, Flow metrics
Tagsno overlap
Continuous improvementQualityProcess improvement
LeanFlowWasteDelivery
Continuous improvementLeanExperiments
FlowVisual managementDelivery
Add more methods