View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Architecture Risk Storming | ![]() Product Discovery Experiment Canvas | ![]() Product Discovery Fake Door Test |
|---|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When experiments become unreadable after the fact, it arranges hypothesis, signal, and learning goal on a single canvas. It separates problem, assumption, solution, and evidence. The result is captured as a Completed Experiment Canvas and a Success Metric. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. |
Complexitydifferent | High | Low | Low | Medium |
Timedifferent | 2-12 Wochen | 60-90 min | 30-60 min | 1-5 Tage |
Participantsdifferent | 3-10 | 4-12 | 1-5 | Nutzertraffic |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Async |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Annotated Diagram, Prioritized Risk List, Action Backlog | Completed Experiment Canvas, Success Metric | Click Data, Interest Signal, Learning Decision |
Tagsno overlap | Continuous improvementQualityProcess improvement | RiskArchitectureWorkshopValidation | ExperimentsValidationDiscoveryHypothesis | ValidationExperimentsDemandDiscovery |



