View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Delivery RAID Log | ![]() Facilitation Power Interest Grid | ![]() Agile ROAM Board |
|---|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List. |
Complexitydifferent | High | Low | Low | Low |
Timedifferent | 2-12 Wochen | 30 min Setup, dann laufend | 30-60 min | 20-40 min initial, dann laufend |
Participantsdifferent | 3-10 | 1-3 maintaining, briefing for everyone | 2-8 | 3-15 |
Formatdifferent | Workshop + async | Async | Workshop | Workshop + async |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | RAID Log, Status Report Source | Power Interest Grid, Strategy per Stakeholder | ROAM Board, Owner List |
Tagsno overlap | Continuous improvementQualityProcess improvement | RiskTrackingStakeholdersGovernance | StakeholdersFacilitationAlignmentPlanning | RiskAgileTrackingAlignment |



