View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations DMAIC | ![]() Decision Making PERT Estimation | ![]() Decision Making Assumption Surfacing | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | High | Medium | Low | High |
Timedifferent | 2-12 Wochen | 15-45 min | 45-90 min | 2-6 h |
Participantsdifferent | 3-10 | 1-8 | 2-8 | 3-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Project Charter, Measurement Plan, Cause Analysis, Control Plan | PERT Estimate, Expected Value, Risk Notes | Assumption List, Critical Assumptions, Learning Plan | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | Continuous improvementQualityProcess improvement | EstimationUncertaintyRisk | AssumptionsRiskDecisionDiscovery | RiskQualityOperationsRoot cause |



