methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for DMAIC.
Operations
DMAIC
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Purposedifferent
For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.
Complexitydifferent
HighLowMediumMedium
Timedifferent
2-12 Wochen1 h bis mehrere WochenOngoing1-3 h
Participantsdifferent
3-101-82-122-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Project Charter, Measurement Plan, Cause Analysis, Control PlanPDCA Log, Experiment Plan, Learning Outcome, Standard ChangeKanban board, WIP policies, Flow metricsStandard Work Sheet, Deviation List, Improved Standard, Training Needs
Tagsno overlap
Continuous improvementQualityProcess improvement
Continuous improvementLeanExperiments
FlowVisual managementDelivery
LeanProcessQuality
Add more methods