methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for DMAIC.
Operations
DMAIC
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighMediumHighLow
Timedifferent
2-12 Wochen45-60 minSeveral meetings plus preparation and analysis; total effort depends on scope60-90 min
Participantsdifferent
3-102-8Evaluation team, architects, and relevant stakeholders4-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Project Charter, Measurement Plan, Cause Analysis, Control PlanAssumption map, Test backlog, Risk rankingPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
Continuous improvementQualityProcess improvement
AssumptionsRiskExperimentsValidation
ArchitectureQualityRiskTradeoffsStakeholders
RiskArchitectureWorkshopValidation
Add more methods