methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowMediumLowHigh
Timedifferent
1-2 h1-3 h45-90 min90-180 min
Participantsdifferent
2-84-102-83-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
DIBB document, Belief list, Bet list, Learning reportCurrent-state map, Future-state map, Bottleneck listAssumption List, Critical Assumptions, Learning PlanCoD Table, Prioritization Sequence
Tagsno overlap
StrategyDecisionAssumptionsHypothesis
LeanFlowWasteDelivery
AssumptionsRiskDecisionDiscovery
PrioritizationDeliveryEconomicsDecision
Add more methods