methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration for Solution Interview
Product Discovery
Solution Interview
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.When a solution idea is already on the table, it checks how it is understood and evaluated. It looks for resonance, objections, and missing fit early in the conversation.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighMediumHighLow
Timedifferent
4-5 Tage30-60 min je InterviewSeveral meetings plus preparation and analysis; total effort depends on scope60-90 min
Participantsdifferent
5-85-10 InterviewsEvaluation team, architects, and relevant stakeholders4-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Prototype, Test Findings, Decision RationaleSolution Feedback, Objection List, Validation NotesPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
Design sprintPrototypeValidationInnovation
ValidationInterviewsPrototype
ArchitectureQualityRiskTradeoffsStakeholders
RiskArchitectureWorkshopValidation
Add more methods