methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration for Risk Storming.
Architecture
Risk Storming
Design Thinking as a learning loop: an observation notebook, a focused problem statement, different idea sketches, a cardboard prototype and user-test notes. Feedback leads to new understanding.
Innovation
Design Thinking
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.For complex user problems with an uncertain cause, the method connects observation, interpretation, and experiment into a learning cycle. It keeps the focus on real needs and avoids premature solution language. This produces robust decisions for product and service.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
HighLowHighHigh
Timedifferent
4-5 Tage60-90 min1 Tag bis mehrere WochenSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
5-84-124-10Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Prototype, Test Findings, Decision RationaleAnnotated Diagram, Prioritized Risk List, Action BacklogProblem Statement, Prototype, Test LearningsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
Design sprintPrototypeValidationInnovation
RiskArchitectureWorkshopValidation
InnovationPrototypeResearch
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods