methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration for Problem Interview
Product Discovery
Problem Interview
Paper illustration for Fake Door Test
Product Discovery
Fake Door Test
Paper illustration of MVP Test Matrix with a method-specific labelled workspace.
Product Discovery
MVP Test Matrix
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.When the picture of the problem still needs to become solid, it asks about real situations and consequences. It separates genuine suffering from mere interest in a solution.When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small.When several minimal variants compete to answer the same question, it makes comparing and choosing between them cleaner. It separates problem, assumption, solution, and evidence. The result is captured as a Test Matrix and a Test Plan.
Complexitydifferent
HighMediumMediumMedium
Timedifferent
4-5 Tage30-60 min je Interview1-5 Tage45-75 min
Participantsdifferent
5-85-12 InterviewsNutzertraffic2-8
Formatdifferent
WorkshopWorkshop + asyncAsyncWorkshop
Outputdifferent
Prototype, Test Findings, Decision RationaleProblem Evidence, Risk Notes, Customer SegmentsClick Data, Interest Signal, Learning DecisionTest Matrix, Test Plan
Tags1 shared
Design sprintPrototypeValidationInnovation
DiscoveryInterviewsValidation
ValidationExperimentsDemandDiscovery
ExperimentsValidationDiscoveryOptions
Add more methods