View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Design Sprint | ![]() Operations Fault Tree Analysis | ![]() Product Discovery Smoke Test | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage. | When demand only needs to be roughly verified, it tests interest with minimal effort. It measures whether people would take a next step at all. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | High | High | Low | Medium |
Timedifferent | 4-5 Tage | 2-6 h | 1-5 Tage | 45-60 min |
Participantsdifferent | 5-8 | 3-8 | Nutzertraffic | 2-8 |
Formatdifferent | Workshop | Workshop + async | Async | Workshop + async |
Outputdifferent | Prototype, Test Findings, Decision Rationale | Fault Tree, Critical Paths, Cause Hypotheses, Control Actions | Interest Metrics, Conversion Signal, Learning Note | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | Design sprintPrototypeValidationInnovation | RiskRoot causeSafety | ValidationExperimentsDemandGrowth | AssumptionsRiskExperimentsValidation |



