methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
HighMediumHighLow
Timedifferent
4-5 Tage1-2 hSeveral meetings plus preparation and analysis; total effort depends on scope60-90 min
Participantsdifferent
5-84-12Evaluation team, architects, and relevant stakeholders4-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Prototype, Test Findings, Decision RationaleAlignment Map, Open Issues, Decision QuestionsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
Design sprintPrototypeValidationInnovation
AlignmentStakeholdersStrategyFacilitation
ArchitectureQualityRiskTradeoffsStakeholders
RiskArchitectureWorkshopValidation
Add more methods