methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Smoke Test.
Product Discovery
Smoke Test
Paper illustration for Fake Door Test
Product Discovery
Fake Door Test
Purposedifferent
When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When demand only needs to be roughly verified, it tests interest with minimal effort. It measures whether people would take a next step at all.When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small.
Complexitydifferent
HighLowLowMedium
Timedifferent
4-5 Tage15-45 min1-5 Tage1-5 Tage
Participantsdifferent
5-81-3NutzertrafficNutzertraffic
Formatdifferent
WorkshopAsyncAsyncAsync
Outputdifferent
Prototype, Test Findings, Decision RationaleADR File, Decision Log, RationaleInterest Metrics, Conversion Signal, Learning NoteClick Data, Interest Signal, Learning Decision
Tagsno overlap
Design sprintPrototypeValidationInnovation
ArchitectureRationaleDocumentationGovernance
ValidationExperimentsDemandGrowth
ValidationExperimentsDemandDiscovery
Add more methods