View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Design Sprint | ![]() Growth A/B Testing | ![]() Architecture Architecture Decision Record | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | High | High | Low | Medium |
Timedifferent | 4-5 Tage | 1-4 Wochen | 15-45 min | 45-60 min |
Participantsdifferent | 5-8 | 1-6 | 1-3 | 2-8 |
Formatdifferent | Workshop | Async | Async | Workshop + async |
Outputdifferent | Prototype, Test Findings, Decision Rationale | Experiment results, Decision log, Learning summary | ADR File, Decision Log, Rationale | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | Design sprintPrototypeValidationInnovation | ExperimentsGrowthAnalyticsValidation | ArchitectureRationaleDocumentationGovernance | AssumptionsRiskExperimentsValidation |



