methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Decision Tree method illustration showing its working structure
Decision Making
Decision Tree
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for Trade-off Analysis.
Decision Making
Trade-off Analysis
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.With limited resources, quality, speed, cost, and risk almost always compete with each other. Trade-off Analysis makes these tensions explicit and prevents decisions from producing hidden side effects.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
MediumLowMediumHigh
Timedifferent
30-90 min30 min Setup, dann laufend45-120 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-61-3 maintaining, briefing for everyone2-8Evaluation team, architects, and relevant stakeholders
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Decision Tree, Option Map, Assumption ListRAID Log, Status Report SourceTrade-off Matrix, Criteria List, Decision Rationale, Accepted DownsidesPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
DecisionTreeOptions
RiskTrackingStakeholdersGovernance
TradeoffsDecisionCriteriaOptions
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods