methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Risk Storming.
Architecture
Risk Storming
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowLowLowHigh
Timedifferent
60-90 min60-90 min15-30 min2-8 h
Participantsdifferent
4-104-122-62-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentAnnotated Diagram, Prioritized Risk List, Action BacklogRoot cause notes, CountermeasuresProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
RiskArchitectureWorkshopValidation
Root causeIncidentLeanProblem solving
Problem solvingRoot causeDecisionOperations
Add more methods