methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowLowHigh
Timedifferent
60-90 min30 min Setup, dann laufend30-60 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
4-101-3 maintaining, briefing for everyone3-10Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentRAID Log, Status Report SourceRisk Matrix, Top Risk ListPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
RiskTrackingStakeholdersGovernance
RiskDecisionPrioritizationAssessment
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods