methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
LowHighMediumHigh
Timedifferent
60-90 min2-4 h15-60 min je ZyklusHalf day
Participantsdifferent
4-103-81-83-12
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsSituation Assessment, Decision Loop, Action UpdatesLeverage Map, Action Strategy
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
Theory of ConstraintsSystems thinkingChange
DecisionChangeLearningStrategy
Systems thinkingChangeStrategy
Add more methods