methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.
Complexitydifferent
LowHighHighMedium
Timedifferent
60-90 min2-4 h2-8 h45-90 min
Participantsdifferent
4-103-82-82-5
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsProblem Analysis, Decision Analysis, Risk PlanA3 Report, Action Plan, Root Cause Analysis
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
Theory of ConstraintsSystems thinkingChange
Problem solvingRoot causeDecisionOperations
LeanProblem solvingCoachingOperations
Add more methods