methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
LowMediumLowLow
Timedifferent
60-90 min30-180 min60-90 min45-90 min
Participantsdifferent
4-101-64-122-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentFault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaAnnotated Diagram, Prioritized Risk List, Action BacklogAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
TroubleshootingDiagnosisEngineering
RiskArchitectureWorkshopValidation
AssumptionsRiskDecisionDiscovery
Add more methods