methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowLowHighHigh
Timedifferent
60-90 min30-90 min2-6 h2-8 h
Participantsdifferent
4-102-83-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesCurrent Reality Tree, Core Problems, Intervention IdeasProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
ConstraintsDecisionPlanningOptions
Systems thinkingRoot causeConstraintsCausality
Problem solvingRoot causeDecisionOperations
Add more methods