methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowHighLowLow
Timedifferent
60-90 minSeveral meetings plus preparation and analysis; total effort depends on scope30-60 min60-90 min
Participantsdifferent
4-10Evaluation team, architects, and relevant stakeholders3-104-12
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRisk Matrix, Top Risk ListAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
ArchitectureQualityRiskTradeoffsStakeholders
RiskDecisionPrioritizationAssessment
RiskArchitectureWorkshopValidation
Add more methods