methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
LowLowHighLow
Timedifferent
60-90 min1-2 Tage1-4 Wochen15-45 min
Participantsdifferent
4-101-41-61-3
Formatdifferent
WorkshopWorkshop + asyncAsyncAsync
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentArchitecture Document, Context View, Runtime View, Deployment ViewExperiment results, Decision log, Learning summaryADR File, Decision Log, Rationale
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
ArchitectureDocumentationCommunication
ExperimentsGrowthAnalyticsValidation
ArchitectureRationaleDocumentationGovernance
Add more methods