methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for ALPEN Method
Operations
ALPEN Method
Paper illustration for Risk Storming.
Architecture
Risk Storming
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitysame
LowLowLowLow
Timedifferent
60-90 min10-20 min daily60-90 min20–45 min
Participantsdifferent
4-1014-12Small cross-functional group
Formatdifferent
WorkshopAsyncWorkshopWorkshop
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentDaily Plan, Time Estimates, Review NotesAnnotated Diagram, Prioritized Risk List, Action BacklogRisk list, Mitigation plan, Assumption log
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
PlanningTime managementProductivityOperations
RiskArchitectureWorkshopValidation
RiskDecisionFailurePlanning
Add more methods