methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowLowMediumLow
Timedifferent
60-90 min15-45 min2–4 h review as a planning range; preparation and evaluation additional60-90 min
Participantsdifferent
4-101-3Designers, developers as users, and facilitation4-12
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop
Outputdifferent
Problem Cluster, Prioritized Challenge, ExperimentADR File, Decision Log, RationalePrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
FacilitationDecisionProblem solvingWorkshop
ArchitectureRationaleDocumentationGovernance
ArchitectureEngineeringFeedbackValidationTasks
RiskArchitectureWorkshopValidation
Add more methods