methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for DACI
Decision Making
DACI
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
In cross-functional decisions, responsibilities quickly blur between approval, influence, and execution. DACI arranges these roles so decision pressure, contribution, and information stay cleanly separated.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitydifferent
LowLowHighLow
Timedifferent
30-60 min30-60 minSeveral meetings plus preparation and analysis; total effort depends on scope30 min Setup, dann laufend
Participantsdifferent
2-103-10Evaluation team, architects, and relevant stakeholders1-3 maintaining, briefing for everyone
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
DACI Matrix, Decision Owner, Decision LogRisk Matrix, Top Risk ListPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRAID Log, Status Report Source
Tagsno overlap
DecisionRolesGovernanceAlignment
RiskDecisionPrioritizationAssessment
ArchitectureQualityRiskTradeoffsStakeholders
RiskTrackingStakeholdersGovernance
Add more methods