View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Cynefin Workshop | ![]() Decision Making Red Teaming | ![]() Systems Thinking Rich Picture | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | When problems are unclear, chaotic, or only seemingly familiar, standard recipes fall short. A Cynefin Workshop sorts situations by the nature of their problem and connects them with matching action logic. | For strategic decisions with high reach, agreement and gut feeling are often not enough. Red teaming brings deliberate opposition into the situation and tests where a plan breaks under real counterarguments. | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Medium | High | Low | Low |
Timedifferent | 60-180 min | 1-4 h | 30-90 min | 45-90 min |
Participantsdifferent | 4-20 | 3-8 | 2-10 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Cynefin Map, Domain-specific Actions, Sensemaking Notes | Challenge Findings, Risk Register, Mitigation Plan | Rich Picture, Problem Framing Notes | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | ComplexitySensemakingDecision | RiskDecisionSensemaking | Systems thinkingSoft systemsFramingVisualization | AssumptionsRiskDecisionDiscovery |



