methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration for Risk Storming.
Architecture
Risk Storming
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
HighLowHighMedium
Timedifferent
2-6 h60-90 min1-4 Wochen45-60 min
Participantsdifferent
3-84-121-62-8
Formatdifferent
WorkshopWorkshopAsyncWorkshop + async
Outputdifferent
Current Reality Tree, Core Problems, Intervention IdeasAnnotated Diagram, Prioritized Risk List, Action BacklogExperiment results, Decision log, Learning summaryAssumption map, Test backlog, Risk ranking
Tagsno overlap
Systems thinkingRoot causeConstraintsCausality
RiskArchitectureWorkshopValidation
ExperimentsGrowthAnalyticsValidation
AssumptionsRiskExperimentsValidation
Add more methods