methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
HighLowLowLow
Timedifferent
2-6 h30-60 min20–45 min45-90 min
Participantsdifferent
3-83-10Small cross-functional group2-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Current Reality Tree, Core Problems, Intervention IdeasRisk Matrix, Top Risk ListRisk list, Mitigation plan, Assumption logAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
Systems thinkingRoot causeConstraintsCausality
RiskDecisionPrioritizationAssessment
RiskDecisionFailurePlanning
AssumptionsRiskDecisionDiscovery
Add more methods