methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
HighLowLowLow
Timedifferent
2-6 h20–45 min15-30 min30-90 min
Participantsdifferent
3-8Small cross-functional group2-62-8
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Current Reality Tree, Core Problems, Intervention IdeasRisk list, Mitigation plan, Assumption logRoot cause notes, CountermeasuresConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
Systems thinkingRoot causeConstraintsCausality
RiskDecisionFailurePlanning
Root causeIncidentLeanProblem solving
ConstraintsDecisionPlanningOptions
Add more methods