View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Product Discovery Assumption Mapping | ![]() Growth A/B Testing | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 8-15 min | 45-60 min | 1-4 Wochen | 45-90 min |
Participantsdifferent | 1-10 | 2-8 | 1-6 | 2-8 |
Formatdifferent | Workshop | Workshop + async | Async | Workshop + async |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | Assumption map, Test backlog, Risk ranking | Experiment results, Decision log, Learning summary | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | AssumptionsRiskExperimentsValidation | ExperimentsGrowthAnalyticsValidation | AssumptionsRiskDecisionDiscovery |



