View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Innovation Crazy 8s | ![]() Operations ABC Analysis | ![]() Innovation Rapid Ideation | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | When a decision needs to be prepared quickly, the method generates many solution-close variants in a short time. It deliberately relies on pace to undercut self-censorship and perfectionism. This quickly produces a usable field for prioritization and further work. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitysame | Low | Low | Low | Low |
Timedifferent | 8-15 min | 30-60 min | 5-20 min | 45-90 min |
Participantsdifferent | 1-10 | 1-5 | 1-20 | 3-10 |
Formatdifferent | Workshop | Async | Workshop + async | Workshop |
Outputdifferent | Sketch Set, Idea Shortlist, Direction Options | ABC Classification, Focus Rules, Control List | Ideenpool, Roh-Shortlist, Cluster | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | BrainstormingSketchingSpeedDivergenceDesign sprint | PrioritizationOperationsPortfolio | BrainstormingIdeationDivergenceSpeed | BrainstormingIdeationCreativityDivergenceWorkshop |



